A mixed-integer programming model forcycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks

Thumbnail Image

Date

2020-07-06

Authors

Journal Title

Journal ISSN

Volume Title

Publisher

Universidad Politecnica de Valencia

Abstract

In assembly lines, rework stations are generally used for reprocessing defective items. On the other hand, using rework stations for this purpose only might cause inefficient usage of the resources in this station especially in an assembly line with a low defective rate. In this study, a mixed-integer programming model for cycle time minimization is proposed by considering the use of rework stations for performing parallel tasks. By linearizing the non-linear constraint about parallel tasks using a variate transformation, the model is transformed to a linear-mixed-integer form. In addition to different defective rates, different rework station positions are also considered using the proposed model. The performance of the model is analyzed on several test problems from the related literature.

Description

Keywords

Engineering, Workstations, Cost, Assembly line balancing, Cycle time minimization, Mixed-integer programming, Parallel tasks, Rework station

Citation

Çavdur, F. ve Kaymaz, E. (2020). "A mixed-integer programming model forcycle time minimization in assembly line balancing: Using rework stations for performing parallel tasks". International Journal of Production Management and Engineering, 8(2), 109-121.

Collections